麻豆传媒

Skip to main content
Start of main content

Helping keep Awoonga dam safe and environmentally sound

Location
Gladstone, Queensland
Offices

Awoonga Dam Safety Review and Comprehensive Risk Assessment

By law, dam owners in Australia must meet increased regulatory requirements. They need to conduct regular safety reviews to make sure their assets are operating and maintained to the highest environmental and safety standards. In light of this, our team was awarded a contract to undertake a 20-year dam safety review and comprehensive risk assessment of Awoonga High Dam on behalf of the Gladstone Area Water Board (GAWB).

As the sole source of water for Gladstone’s domestic and industrial customers, the Awoonga Dam is a concrete faced rockfill dam with an ungated concrete ogee crest spillway section. The scope of our work included a background review and gap analysis, geological studies and modelling, hydrology and hydraulic assessment, stability assessment, and failure impact assessment. We also performed a review of instrumentation, comprehensive site inspection and risk assessment, as well as reporting.

Working closely with the client, our team delivered this significant study within a six month timeframe to help the GAWB meet their regulatory requirements. Following the completion of this project, we were awarded a major contract to undertake the detailed design and construction support for Awoonga Dam Spillway Upgrade.

With regulatory requirements and sound engineering practices met, the community in Gladstone can be confident they have a water system they can rely on.

Location
Gladstone, Queensland
Offices

Meet Our Team

Mark Cordell, Market Leader—Dams and Hydropower, Australia

I get satisfaction at work by making sure our solutions are not only technically sound and cost effective but also ‘best for project’.
Mark Cordell Market Leader—Dams and Hydropower, Australia Read More

Tim Buckley, Practice Leader – Digital Engineering & BIM, Water, Australia

Documenting digital engineering design is an inclusive process that allows for streamlined workflows and provides usability benefits.
Tim Buckley Practice Leader – Digital Engineering & BIM, Water, Australia Read More

Mark Cordell

Market Leader—Dams and Hydropower, Australia

Tim Buckley

Practice Leader – Digital Engineering & BIM, Water, Australia

We’re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top