麻豆传媒

Skip to main content
Start of main content

Combining local and global water infrastructure and engineering knowledge to prepare studies and dam raising options

At a Glance

  • 14M

    Height Raise

  • 75km?

    Reservoir Size

  • 5M

    People Supplied

Location
Sydney, New South Wales
Offices
Client
  • WaterNSW
Partners
  • GHD

Warragamba Dam Studies and Dam Raising

Sitting 142 metres high by 351 metres long, with a central gated spillway section about 90 metres wide, the Warragamba Dam is Sydney’s largest supply of water. It accounts for about 80% of the available water supply for the region.

Since 2018, our team has undertaken various studies to identify options to create a flood mitigation zone. Early studies included gate upgrade options, fault tree and failure mode analysis, and drum seismic assessment. We then explored options for raising the dam by up to 14 metres and investigated alternatives, such as building a new dam. In 2020, after considering all possibilities, we developed the best design raise option and a detailed concept design to support the business case.

Combining local and global water infrastructure and engineering knowledge, we continue to support WaterNSW with work at Warragamba and floodwater reduction measures in the Hawkesbury-Nepean Valley region. Ultimately, we’re working to reduce risk to life, property, and community assets.

At a Glance

  • 14M

    Height Raise

  • 75km?

    Reservoir Size

  • 5M

    People Supplied

Location
Sydney, New South Wales
Offices
Client
  • WaterNSW
Partners
  • GHD

We’re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top