Â鶹´«Ã½

Skip to main content
Start of main content

Innovation and efficiency

At a Glance

  • 69K

    Square Feet

  • $26M

    Construction Budget

Location
Regina, Saskatchewan
Offices

City of Regina Transit Fleet Maintenance Facility

The City of Regina (CoR) needed a new fleet maintenance facility to accommodate the current and future expansion of the City¡¯s bus fleet. But¡ªto accommodate future growth¡ªadditional storage space for the buses was also required. A key component of the design was to have all the services on one site to allow the City to increase their operational efficiency.

As part of the planning process, we considered how the new transit fleet maintenance facility (TFMF) would have a positive impact on the overall operations, how the increased mixed traffic flow would need to be accommodated on the site, and how the existing transit operation center (TOC) could remain in full operation with minimal disruption during the construction period.

Repair bays were designed with integrated bus lifts and fluid dispensing systems to allow for safe and efficient bus servicing. The bays are also arranged around a central corridor to allow for easy transport of spares from the central storage and office building. The central portion of the building includes office space with locker rooms, but the main function of this area is for storage for parts for the bus fleet. The new facility is designed to accommodate a large range of bus sizes including future articulated buses.

At a Glance

  • 69K

    Square Feet

  • $26M

    Construction Budget

Location
Regina, Saskatchewan
Offices

We¡¯re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You¡¯re exactly what¡¯s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top