- Location
- Oroville, California
- Offices
-
- Location
- Oroville, California
- Offices
Share
Emergency Transmission Line Re-route - Oroville Dam
When key transmission lines to the Oroville generation station failed, the dam was facing an emergency. With towers close to the zone of failure, three 240 kV transmission circuits that traversed over the spillway urgently needed to be replaced. We stepped in to help.
Our transmission line experts were awarded an emergency support contract to design a temporary reroute of the key transmission lines. We came up with temporary and permanent solutions to relocate the lines away from the spillway and potential collapse, and, within three months, our teams had come up with a temporary wood solution to have the lines installed and relocated away from the spillway. Then, we worked on a permanent solution to relocate the new transmission lines a large distance away from the spillway.
To date, our team has provided strategic support, including dam safety, hydraulic analysis and modeling, geotechnical surveying, transmission design and construction and cost estimating support. In the end, we were able to engineer, procure and support the construction of two different three circuit 240kV transmission lines in less than seven months¡ªhalf the time a project like this traditionally takes.
- Location
- Oroville, California
- Offices
-
- Location
- Oroville, California
- Offices
Share
We¡¯re better together
-
Become a client
Partner with us today to change how tomorrow looks. You¡¯re exactly what¡¯s needed to help us make it happen in your community.
-
Design your career
Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.