At a Glance
-
500kV
- Location
- Fraser-Fort George, British Columbia
- Offices
-
- Location
- Fraser-Fort George, British Columbia
- Offices
Share
Fraser River Crossing Replacement - 5L44 Rebuild Project
Operating on a fast-tracked design schedule, we worked with BC Hydro to replace two existing towers crossing the Fraser River between Surrey and Coquitlam. Providing engineering and detailed design, procurement, and construction management, we were able to meet tight deadlines, environmental challenges, and navigate difficult terrain to get the work done. A CN rail line, the South Fraser Perimeter Road, and the Fraser River navigation were all elements of the project that needed coordination and management in order to successfully finish the project, without negative impacts to any system.
At a Glance
-
500kV
- Location
- Fraser-Fort George, British Columbia
- Offices
-
- Location
- Fraser-Fort George, British Columbia
- Offices
Share
We¡¯re better together
-
Become a client
Partner with us today to change how tomorrow looks. You¡¯re exactly what¡¯s needed to help us make it happen in your community.
-
Design your career
Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.