Â鶹´«Ã½

Skip to main content
Start of main content

Renovations transform local waste and recycling facility into a lean, mean, and green operation

At a Glance

  • 45

    Tons/Hour

Location
Lethbridge, Alberta
Offices

Lethbridge Waste and Recycling Centre

It¡¯s hard to run a waste and recycling operation when you have to close down your landfill to minimize blowing debris every time it gets too windy. We worked with the windy City of Lethbridge to make its waste and recycling centre's operation and householder experience more debris-free and headache-free.

Our proposed design included modifications for one of the buildings to house a 45 ton per hour waste baling and bagging facility which would compact waste and stop the blowing debris. This has reduced the facility¡¯s required building footprint¡ªit now takes up less space while other site modifications, such as a new entrance, dual weigh scale and scale house facility, compost facility, and surface water management facility have reduced operating costs.

The experience of recycling and waste disposal was revamped to make it more straightforward. The transformed drop-off area now features clear signage identifying where recyclable items should go and better traffic management for enhanced user safety. Encouraging diversion of waste from landfill and more recycling visits, this leaner, greener, and more streamlined facility now remains open for business even on the windiest days.

At a Glance

  • 45

    Tons/Hour

Location
Lethbridge, Alberta
Offices

We¡¯re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You¡¯re exactly what¡¯s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top