Â鶹´«Ã½

Skip to main content
Start of main content

A new 88 kilometre regional water system in under 14 months

At a Glance

  • 88

    Kilometers

  • $28M

    Construction Value

Location
Athabasca County, Alberta
Offices
Client
  • Athabasca County
Partners
  • Graham Design Builders
  • Pidherney¡¯s Construction
Award
2014 Consulting Engineers of Alberta Showcase Awards Award of Excellence
Award
2013 Alberta Public Works Association Project of the Year

Wandering River Regional Water System

The Wandering River regional waterline is a 150-milimetre, 88-kilometre system that extends from Boyle to Wandering River via Grassland in Athabasca County.

Wandering River¡¯s existing water treatment plant was scheduled for demolition by the end of 2012, necessitating a new potable water supply source. The solution? A regional water system extension would enable a connection to the community of Grassland 55 kilometres to the south as well as the farming and acreage owners along the proposed system.

The system consists primarily of fusible polyvinyl chloride (FPVC) pipe. This represents the largest project by length of FPVC pipe directionally drilled and installed to date in North America. This was also the first regional waterline project in Alberta completed using a design-build delivery.

Directional drilling was used for the entire length as it presented several advantages including winter construction, reduced cleanup, and minimized disturbances to landowners.?In fact, as the project was nearing completion, the owner shared with the design-build team the story of a local resident who was curious as to when construction was scheduled to commence!

With this project, Alberta embarked on a significant new chapter in the construction of potable water systems. Our team and the design-build team undertook this project with the understanding that success or failure here would directly impact future opportunities to carry forward the design-build methodology for municipal water systems. Through a committed team effort from the owners, operators, designers, contractors, sub-contractors, and others, this project was a huge success.

At a Glance

  • 88

    Kilometers

  • $28M

    Construction Value

Location
Athabasca County, Alberta
Offices
Client
  • Athabasca County
Partners
  • Graham Design Builders
  • Pidherney¡¯s Construction
Award
2014 Consulting Engineers of Alberta Showcase Awards Award of Excellence
Award
2013 Alberta Public Works Association Project of the Year

Meet Our Team

Stephan Weninger, Principal, Water

At Â鶹´«Ã½, we believe in fully understanding the needs of our clients, because we are invested in their communities and want to ensure they thrive.

Todd Simenson, Vice President

Strong client relationships are built from the ground up with a long-term vision and commitment to the details that make a difference.

Stephan Weninger

Principal, Water

Todd Simenson

Vice President

We¡¯re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You¡¯re exactly what¡¯s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top