At a Glance
-
200
- Location
- Wuxi City, Jiangsu Province
- Offices
-
- Location
- Wuxi City, Jiangsu Province
- Offices
Share
Phase I&II ESA and HHRA for a Wind Turbine Blades Manufacturing Site
The target site¡ªwhich is a manufacturing facility in the wind power business with an annual chemical consumption of over 2,000 metric tons¡ªoccupies approximately 160,000 square metres. When our client needed to conduct a government-required, comprehensive environmental site assessment (ESA) for the target site, our team was brought in to evaluate the nature of the target site.
First, a Phase I ESA was conducted to identify known/suspected environmental issues associated with the current and historical operations at the target site. Then, a Phase II ESA was conducted to document soil and groundwater conditions. Given elevated concentrations of polycyclic aromatic hydrocarbons (PAHs) in some soil samples, we also performed a site-specific human health risk assessment (HHRA). The results? Human health risk levels due to the elevated PAHs fell within health and safety guidelines.
The combined site investigation and assessment were conducted in accordance with both international and local technical specifications and were recognized by the local government. Now, thanks to the results of the assessments, the target site is exempt from potentially costly and time-consuming remediations.
At a Glance
-
200
- Location
- Wuxi City, Jiangsu Province
- Offices
-
- Location
- Wuxi City, Jiangsu Province
- Offices
Share
We¡¯re better together
-
Become a client
Partner with us today to change how tomorrow looks. You¡¯re exactly what¡¯s needed to help us make it happen in your community.
-
Design your career
Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.