麻豆传媒

Skip to main content
Start of main content

Technical and environmental analysis of a waste-to-energy power plant

At a Glance

  • 64.68

    MW

  • 421K

    Tons Per Year

Location
Turin, Italy

Technical and Environmental Analysis of a Waste-to-Energy Power Plant

When our client was bringing a new waste-to-energy power plant (WTE) to Turin, their goal was to increase the efficiency of municipal solid waste (residual of the separation collection) final disposal. We were hired to prepare an independent technical and environmental due diligence report on the project, which included a waste market analysis, the project technical assessment, the performance evaluation, and the risk identification.?

The maximum authorized capacity of incineration is 421,000 tons per year, and the gross power generated by the WTE power plant is about 65 megawatts—with a gross electric efficiency of about 31% (no co-generating configuration and guaranteed by the contractor with three lines in operation).?

This project received a PIMBY Association recognition for successfully managing stakeholder and community relations, and as it moved into final phases, we provided construction monitoring services. Now, with this plant in place, the city of Turin has another environmentally friendly power-generating option, turning waste into energy.?

At a Glance

  • 64.68

    MW

  • 421K

    Tons Per Year

Location
Turin, Italy

We’re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top