Â鶹´«Ã½

Skip to main content
Start of main content

Re-routing construction traffic and abnormal loads

Location
Dumfries and Galloway, United Kingdom
Offices
Client
  • Muirhall Energy Ltd.

Crossdykes Wind Farm

Muirhall Energy Ltd. had 15 wind turbines that they wanted to get to Crossdykes Wind Farm. When in operation, this wind farm would produce up to 48 megawatts of energy. But first they had to get the turbines to the location.

Our contribution involved identifying the preferred route for construction traffic and abnormal loads in consultation with relevant stakeholders. We assessed the routes to identify any remedial measures required (including concerns about the C80a), prepared the traffic and transport section of the environmental statement, and produced an outline construction traffic management plan (OCTMP).

Once the project had started, we secured two follow-up pieces of work for other disciplines. The first assessed the potential socio-economic, tourism, and recreation effects that could occur as a result of the proposed development. The second was to consider the need for a temporary bridge design solution at the Black Esk Bridge, which was identified as a pinch point for abnormal indivisible load (AIL) vehicles.

At a meeting of the Planning Applications Committee in May 2016, councillors gave their unanimous backing to the proposal¡ªthe passage of which will clear the way for Crossdykes Wind Farm to produce clean sustainable energy equivalent to powering over 28,400 UK average domestic households.

Location
Dumfries and Galloway, United Kingdom
Offices
Client
  • Muirhall Energy Ltd.

We¡¯re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You¡¯re exactly what¡¯s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top