- Location
- California
- Offices
-
- Location
- California
- Offices
Share
2 MW ECM Battery Storage Design Build
The EMC 13 project entailed 2 MW (4 MWh) of battery energy storage (2 x 1 MW systems), designed for demand management applications. Both systems included solar photovoltaic (PV) system installations that were designed to produce excess power for storage in the batteries. Both systems were also designed to include islanding capability to support some of the critical functions on each base. We prepared design-build bridging documents for these projects.?
- Location
- California
- Offices
-
- Location
- California
- Offices
Share
Mike Voll, Principal, Sector Lead Smart Technologies
You don¡¯t have to dig deep in the earth to find the energy we need to survive. Blowing wind, flowing rivers and warming sun are easily accessible for those with the passion to harness them.
We¡¯re better together
-
Become a client
Partner with us today to change how tomorrow looks. You¡¯re exactly what¡¯s needed to help us make it happen in your community.
-
Design your career
Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.