Â鶹´«Ã½

Skip to main content
Start of main content

Conveyance system design

At a Glance

  • $160M

    Construction Cost

  • 50

    MGD Capacity

  • $25M

    Saved

Location
Aurora, Colorado
Offices
Client
  • City of Aurora
Award
APWA Project of the Year, 2011

Prairie Waters

Prairie Waters is an innovative system that uses a sustainable water source by recapturing river water to provide drought insurance and a cornerstone of a water supply plan that will help meet much of the City of Aurora¡¯s needs for decades. It was undertaken following significant drought conditions that the city of Aurora experienced, beginning in 2000. The water reserves available to the city became minimal and were not enough to serve the growing population.

Stantec was responsible for planning, preliminary design, final design, services during construction, PLC programming, startup and commissioning, and warranty support for the $160 million, 50 MGD raw water conveyance system portion of the project. This included 34 miles of 60- to 79-inch diameter pipelines, three 6,000 HP pumping stations, and 15 trenchless crossings with casing diameters up to 84 inches. The pipeline is mortar-lined and polyurethane-coated steel pipe with an impressed cathodic protection system.

Trenchless construction was used to cross major highways, railroads, utility lines, drainages, canals, creeks, irrigation ditches, wetlands, and the South Platte River. Our experts navigated significant subsurface variations, including claystone, siltstone, sandstone, clay, and alluvial sands and gravels. Due to high groundwater conditions, significant dewatering was required at trenchless crossings and along much of the overall pipeline. We also performed hydraulic and surge analyses and design for system protection from both controlled and uncontrolled shutdowns.

As part of this project, we implemented?ActiveManuals?as an electronic operation and maintenance manual for the four divisions of the City¡¯s water operations group. This provides Aurora Water with a system-wide, database-driven electronic solution that is user-friendly and easily updated.

At a Glance

  • $160M

    Construction Cost

  • 50

    MGD Capacity

  • $25M

    Saved

Location
Aurora, Colorado
Offices
Client
  • City of Aurora
Award
APWA Project of the Year, 2011

Meet Our Team

Greg Raines, Vice President

It is our responsibility to society, as the engineers, to deliver water conveyance and power tunnels in a safe and reliable manner.

Russ Snow, Senior Vice President, Conveyance

The greatest satisfaction in my career is delivering major water infrastructure projects and see¡ªfirsthand¡ªthe benefit that it brings to the public.

Greg Raines

Vice President

Russ Snow

Senior Vice President, Conveyance

We¡¯re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You¡¯re exactly what¡¯s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top