At a Glance
-
8.7K
-
$15M
- Location
- Dallas, Texas
- Offices
-
-
Client
-
-
City of Dallas
-
- Location
- Dallas, Texas
- Offices
- Client
-
- City of Dallas
Share
Bachman Lake Interceptor Replacement
A 50-year-old sewage interceptor that paralleled Bachman Lake was deteriorating rapidly. It would eventually fail because part of the alignment was under the right arm of a main dam embankment¡ªbut that wasn¡¯t the only problem.
Prior to any work, we conducted a hydraulic study of the interceptor system. The study showed that the line was close to private underground utility lines and a widely used public park. Furthermore, the park was located near the local airport. These factors made open-cut construction too risky. After evaluating replacement options with multiple routes and reviewing various trenchless installation techniques, our team determined that microtunneling would provide the ideal balance of safety and cost efficiency.
We were also proactive in our approach to public outreach. We held multiple community meetings and sent notices in both English and Spanish to stakeholders such as the Federal Aviation Administration and City of Dallas Parks Department.
In total, we designed 8,700 feet (2,600 metres) of new sewer, with three quarters of it constructed via microtunneling. As a result, the community experienced zero disruptions and was able to access the park indefinitely.
At a Glance
-
8.7K
-
$15M
- Location
- Dallas, Texas
- Offices
-
-
Client
-
-
City of Dallas
-
- Location
- Dallas, Texas
- Offices
- Client
-
- City of Dallas
Share
We¡¯re better together
-
Become a client
Partner with us today to change how tomorrow looks. You¡¯re exactly what¡¯s needed to help us make it happen in your community.
-
Design your career
Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.