Â鶹´«Ã½

Skip to main content
Start of main content

Working toward full service operations

At a Glance

  • 118

    Rail Bridges

  • 135

    Miles

Coos Bay Rail Bridge Engineering Support Services

In 2011, the Oregon International Port of Coos Bay expanded into the freight rail business with the initial goal to connect two major centers of manufacturing and commerce. By acquiring the 135 mile Coos Bay Rail Link, the port successfully reestablished freight rail service to help disperse the 2.5 million tons of cargo moving annually along the critical freight route between Eugene and Coquille. We were called in to make sure that the system is in safe and operable shape before full service begins.?

Our team has been busy inspecting and load rating 118 bridges, reviewing and performing field verification of existing inspection and load rating reports, and preparing a scope of work and bid documents for the proposed bridge repairs. Three of the bridges we¡¯re inspecting are swing-span movable bridges, one of which is the longest in North America. The next leg of our project support will include construction management services once the repairs are put into action.

The Coos Bay Rail freight route is used by forest product, natural-gas, and manufacturing companies. Our services will help the port expand on their ability to deliver cargo for these industries, creating an economic boost for the area.

At a Glance

  • 118

    Rail Bridges

  • 135

    Miles

Meet Our Team

Justin Dahl, Principal, Transportation Operations Leader

My passion is providing clients solutions, not problems¨CI haven¡¯t done my job if I don¡¯t deliver a workable solution to address their needs.

Gene Davis, Principal, Rail

Safely is the ONLY way. On a railroad, you have to live it, breathe it, and believe it.

Brandon Elliot, Bridge Engineer

I¡¯m a part of the important and regular bridge inspection process¡ªthis is not only a federal requirement, but also promotes public safety.

Mike Perry, Vice President, Transportation

The true reward of winning new projects is fostering life-long partnerships that transcend the current project.

Seth Poole, Structural Engineer

I love solving problems¡ªfinding better, more efficient, and safer ways to do things is something I strive to do every day.

Taylor Perkins, Principal, Senior Structural Engineer

Complex projects are opportunities for innovation¡ªthe challenge of fusing engineering with creativity inspires me.

Justin Dahl

Principal, Transportation Operations Leader

Gene Davis

Principal, Rail

Brandon Elliot

Bridge Engineer

Mike Perry

Vice President, Transportation

Seth Poole

Structural Engineer

Taylor Perkins

Principal, Senior Structural Engineer

We¡¯re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You¡¯re exactly what¡¯s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top