Â鶹´«Ã½

Skip to main content
Start of main content

You can¡¯t taste the difference between bottled water and this tap water

At a Glance

  • 275

    Mgd Average Flow

  • 405

    Mgd Peak Flow

  • 2.3M

    People

Location
Marlborough, Massachusetts
Offices
Architect
Barrientos, Wu & Associates

John J. Carroll Water Treatment Plant - Technical Assistance

After completing a number of successful technical assistance contracts for the Massachusetts Water Resources Authority (MWRA), Â鶹´«Ã½ was selected for a similar contract at the Carroll Treatment Plant, providing a wide range of engineering services on an as-needed basis to ensure smooth operation of this new facility. Beginning its operations in 2005, the facility treats drinking water for 2.3 million people in 41 metropolitan Boston communities, from Arlington to Boston, Swampscott to Quincy. The plant¡¯s capacity is 275 MGD average and 405 MGD peak.

In a lab analysis and taste test conducted by the local newspaper, MWRA's tap water was compared with various bottled waters. Participants in the taste test, including panelists with sophisticated palates, all agreed that there was essentially no difference between bottled water and the MWRA tap water.

At a Glance

  • 275

    Mgd Average Flow

  • 405

    Mgd Peak Flow

  • 2.3M

    People

Location
Marlborough, Massachusetts
Offices
Architect
Barrientos, Wu & Associates

Services


Markets


We¡¯re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You¡¯re exactly what¡¯s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top