At a Glance
-
300FT
- Location
- Elba, Minnesota
- Offices
-
- Location
- Elba, Minnesota
- Offices
Share
Levee Rehabilitation and Roadway Raising and Drainage Projects
Notorious for flooding, the Whitewater River overtopped the existing levee in 2007 and caused severe damage to Elba, Minnesota. Taking preventive measures to ensure the safety of Elba, we diverted stormwater flows around the city¡¯s levee system, and designed a ponding system and stormwater lift station to pump stormwater runoff generated within the levee system.
We also stabilized 300 foot segment of the Whitewater River streambank and a 30 foot high by 800 foot long roadway embankment overlooking the river. Â鶹´«Ã½ included water quality treatment of diverted stormwater flows using a stormwater quality structure in combination with an infiltration trench, sluice gates within culverts crossing under the levee, geogrid reinforced soil roadway embankments, and stormwater interception trenches along the base of area bluffs.?
At a Glance
-
300FT
- Location
- Elba, Minnesota
- Offices
-
- Location
- Elba, Minnesota
- Offices
Share
We¡¯re better together
-
Become a client
Partner with us today to change how tomorrow looks. You¡¯re exactly what¡¯s needed to help us make it happen in your community.
-
Design your career
Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.