At a Glance
-
2.6mi
-
0.4mi
- Location
- Gilbert, Arizona
- Offices
-
-
Client
-
-
Salt River Project
-
- Location
- Gilbert, Arizona
- Offices
- Client
-
- Salt River Project
Share
Salt River Project Santan Generating Station Alternate Discharge Pipeline
Because of new regulations, Salt River Project (SRP) was faced with a dilemma for discharging the cooling tower blowdown water from the Santan Generating Station¡ªconstruct a lengthy pipeline or build an on-site pretreatment system. Both options proved to be expensive and time consuming. That¡¯s where Â鶹´«Ã½ came in to help.
Stantec and SRP teamed up first in an evaluation study and then in the design and construction of the preferred alternative. The team identified feasible locations for the discharge pipeline and determined a preferred alternative. Being involved in the evaluation study allowed Â鶹´«Ã½ to work quickly to design the pipeline.
Our team managed to significantly minimize the project¡¯s cost and schedule by using existing pressure pipe, upsizing current gravity pipe, and minimizing the installation of new pressure pipe. Not only did this project upgrade and reuse existing infrastructure, it also allowed the water to be recycled into SRP¡¯s irrigation system, instead of being discharged elsewhere.
At a Glance
-
2.6mi
-
0.4mi
- Location
- Gilbert, Arizona
- Offices
-
-
Client
-
-
Salt River Project
-
- Location
- Gilbert, Arizona
- Offices
- Client
-
- Salt River Project
Share
We¡¯re better together
-
Become a client
Partner with us today to change how tomorrow looks. You¡¯re exactly what¡¯s needed to help us make it happen in your community.
-
Design your career
Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.