At a Glance
-
$6M
- Location
- Toledo, Ohio
- Offices
-
- Location
- Toledo, Ohio
- Offices
Share
Toledo Waterways Initiative Phase II - Engineering
Stantec completed four SSES projects totaling about 213,000 LF of sanitary, storm and combined sewers. Sewers range from 8 to 66 inches. Our efforts included manhole inspections, CCTV, smoke and dye testing. Since completing the SSES reports, Â鶹´«Ã½ has developed detailed plans for the implementation of proposed improvements, including storm and sanitary sewer replacement projects from those studies. Â鶹´«Ã½ also developed the detailed design and provided construction phase services for the Ayers/Monroe Storage/Conveyance Pipeline. This project consists of over 3,000 LF of 108 inch pipe, regulator modifications and full width street reconstruction to provide 1.1 MG of inline storage.
Stantec developed plans and specifications for the tunnel optimization projects for the existing CSO storage tunnels in downtown Toledo and the new south end. Improvements include removal of accumulated debris within the system, regulator modifications the addition of mechanical screens and pump upgrades for the tunnel dewatering systems. Additional designs underway include the Dearborn Storage Pipeline consisting of 2,650 LF of 132 inch pipe, outfall relocation, static screens and new regulator structures.
At a Glance
-
$6M
- Location
- Toledo, Ohio
- Offices
-
- Location
- Toledo, Ohio
- Offices
Share
We¡¯re better together
-
Become a client
Partner with us today to change how tomorrow looks. You¡¯re exactly what¡¯s needed to help us make it happen in your community.
-
Design your career
Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.