Â鶹´«Ã½

Skip to main content
Start of main content

Increased capacity, efficiency, and performance

Location
Vantage, Washington
Offices

Wanapum Dam Turbine Rehabilitation

Providing energy to the community of Grant County, Washington, the Wanapum Hydroelectric Development is a powerhouse consisting of ten identical vertical shaft hydraulic turbine-generator units. In 1992¡ªbased on the results of a feasibility study¡ªthe Grant County Public Utility District No. 2 chose to replace the turbine runners with state-of-the-art models of the same type¡ªonly much larger.

The Wanapum Dam Turbine Rehabilitation included the replacement of the original turbines and replacement or refurbishment of generating equipment, which was nearing the end of its lifecycle. The existing 16-stay vanes were reused, while the number of wicket gates were increased from 20 to 32, thus reducing the number of strikes for fish. Plus, fully-spherical hubs and discharge rings eliminate the wedge-shared gaps between wicket gates and the mating parts--a true hazard for fish.

In the end, our design solutions reduced the mortality rate of juvenile fish passing downstream on the dam while simultaneously allowing Grant County to remain compliant with their FERC license. Wanapum now thrives off of increased capacity, efficiency, and performance.

Location
Vantage, Washington
Offices

We¡¯re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You¡¯re exactly what¡¯s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top