At a Glance
-
$430K
-
$360K
- Location
- Tasman, New Zealand
- Offices
-
-
Client
-
-
Tasman District Council
-
- Location
- Tasman, New Zealand
- Offices
- Client
-
- Tasman District Council
Share
Tasman District Bridge Replacements
Bridges are critical links in the road network, often spanning waterways, drainage channels and gorges. Working with our client, the Tasman District Council, we provided a range of bridge project Â鶹´«Ã½ to replace two bridges¡ªthe Mission Bridge on the Moutere Highway and Carter Access Bridge in Golden Bay.
Mission Bridge had become outdated, being too narrow and no longer suited for higher traffic volumes and heavier loads, while Carter Access Bridge was damaged by severe flooding after ex-tropical Cyclone Gita lashed the area.
How did we help? By providing concept design, surveys, geotechnical and hydrology investigations, traffic assessments, and guardrail design. We also supported our client by providing the estimating engineer's role, tender documents, and construction monitoring. On the Mission Bridge project, our hydrology assessment showed we could develop a water catchment area with several irrigation dams. This catchment reduced the peak flow of the river and allowed a shorter bridge to be designed with significant cost-saving. The result? Fit-for-purpose and future-proofed structures that will keep communities connected and safe.
At a Glance
-
$430K
-
$360K
- Location
- Tasman, New Zealand
- Offices
-
-
Client
-
-
Tasman District Council
-
- Location
- Tasman, New Zealand
- Offices
- Client
-
- Tasman District Council
Share
We¡¯re better together
-
Become a client
Partner with us today to change how tomorrow looks. You¡¯re exactly what¡¯s needed to help us make it happen in your community.
-
Design your career
Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.